Cohasset High School

Cohasset High School Acting upon the analysis and recommendations contained in Gene Raymond's Grade 3 - 12 master plan study, the Town of Cohasset approved a two-school addition/renovation program that realigned the grade levels in Cohasset and resulted in tow multi-year renovation and addition projects at the Deer Hill Elementary School and Cohasset Middle-High School.…

Algonquin Regional High School

Algonquin Regional High School I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vivamus gravida condimentum urna, eu ullamcorper turpis malesuada quis. Praesent pellentesque felis eros, ut…

Uxbridge High school

Uxbridge High School RDA was selected to work with the Town of Uxbridge in 2009 to replace the town’s antiquated high school.   From the exterior, this school feels both ‘traditional’ and ‘contemporary’ at the same time.  It makes subtle use of traditional building forms such as brick walls, pediments, pitched roofs, a double-gabled facade marking…

Wachusset Regional High School

Wachusset Regional High School This addition/renovation project houses 2,100 pupils.  It required a detailed analysis of new-build v. renovation/addition options and intensive consensus building among the five towns that make up the regional school district, who had voted down projects from two previous design groups.  The 380,500 sf school was broken down into four houses…